Changes from the previous edition
Synopsis.
AIA Document G714–2017 is a directive for changes in the Work for use where the owner and contractor have not agreed on proposed changes in the contract sum or contract time. G714 should be used to direct changes in the Work which, if not expeditiously implemented, might delay the project. Upon receipt of a completed G714, the contractor must promptly proceed with the change in the work described therein. For use and execution of a document, see its instructions »
Purpose.
AIA Document G714–2017 is a directive for changes in the Work where the Owner and Contractor have not reached an agreement on proposed changes in the Contract Sum or Contract Time.
Related documents.
G714–2017 was prepared for use under the terms of AIA Document A201®–2017, General Conditions of the Contract for Construction, and AIA Document A104™–2017, Standard Abbreviated Form of Agreement Between Owner and Contractor.
Changes from the previous edition.
G714-2017 includes a revised information block to identify the Project, Contract, Owner, Architect, Contractor, and information relevant to the Construction Change Directive. G714-2017 also includes a modified checkbox for proposed adjustments that use a cost plus a Contractor’s fee method of adjustment. The new version allows the parties to insert the Contractor’s fee and a definition of, or a method for determining, costs that are reimbursable to the Contractor.