Skip to content
  • There are no suggestions because the search field is empty.

Summary: G741S™–2024, Change Order for a Design-Build Project, Subcontractor Version

AIA Document G741™S–2024 is for implementing changes in the work agreed to by the design-builder and subcontractor. Execution of a completed AIA Document G741S–2024 indicates agreement upon all the terms of the change, including any changes in the contract sum or guaranteed maximum price and contract time. The form provides space for the signatures of the design-builder and subcontractor and for a complete description of the change.

For use and execution of a document, see its instructions  »