Summary: G741™–2024, Change Order for a Design-Build Project
AIA Document G741™–2024 is for implementing changes in the work agreed to by the owner and design-builder. Execution of a completed AIA Document G741–2024 indicates agreement upon all the terms of the change, including any changes in the contract sum or guaranteed maximum price and contract time. The form provides space for the signatures of the owner and design-builder, and for a complete description of the change.
For use and execution of a document, see its instructions »
Changes from the previous edition.G741-2024 includes a revised information block to identify the Project, Contract, Owner, Design-Builder, and information relevant to the Change Order. The revised information block has also removed the distribution list.