FAQs: Related documents to A133™–2019 (CMc)

Summary

For AIA Document A133™–2019 (CMc), the general conditions are provided by AIA Document A201®–2017. The subcontractor agreement to use is AIA Document A401™–2017, with "Contractor" replaced by "Construction Manager." AIA Document G701™–2017, Change Order, is the amendment form, with similar substitutions. Although no specific bond form for CMc projects exists, AIA Document A312™–2010, Performance Bond and Payment Bond, can be used with "Contractor" replaced by "Construction Manager."

What general conditions are used with for A133–2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price? 

AIA Document A201®–2017, General Conditions of the Contract for Construction.

 

Which Subcontractor agreement may be used with AIA Document A133–2019?

Use AIA Document A401™–2017, Standard Form of Agreement Between Contractor and Subcontractor, by substituting references to the “Contractor” with “Construction Manager”

 

Does the AIA publish an amendment form to use with A133–2019?

Yes. AIA Document G701™–2017, Change Order, may typically be used for modifying or amending A133 during construction. References in G701 to “Contractor” should be substituted with “Construction Manager.”

Note: In AIA Contract Documents software, the only way to substitute the title of a party in G701 is to add an explanatory note in one of the fill points or in the User Notes.

 

Does the AIA publish a bond form specifically tailored for CMc projects?

No. However, AIA Document A312™–2010, Performance Bond and Payment Bond may be used for this purpose by substituting references to “Contractor” with “Construction Manager”.

Was this article helpful?
0 out of 2 found this helpful

Articles in this section

See more
For document related questions:
For technical support:
Our helpline hours:
8:30am - 6:00pm EST Monday to Friday