Instructions: G741S™–2024, Change Order for a Design-Build Project, Subcontractor Version

AIA Document G741™S–2024 is for implementing changes in the Work agreed to by the Design-Builder and Subcontractor on a Design-Build Subcontract after the parties have executed the Design-Build Amendment establishing the Subcontract Sum and Subcontract Time. Execution of a completed G741S indicates agreement upon all the terms of the change, including any changes in the Subcontract Sum or Guaranteed Maximum Price and Contract Time.

For all document details and a record of changes, see the summary »

Completing G741S-2024.

Cover Page.

Description of Change in the Subcontract. Insert a detailed description of the change or reference specific exhibits describing, in detail, the change to be made in the Design-Build Subcontract by this Change Order. Include any drawings, specifications, documents, or other supporting data to clarify the scope of the change.

Determination of Costs. Insert in the blanks provided, or strike out the terms in parentheses that do not apply:

1)         the original Subcontract Sum or Guaranteed Maximum Price;

2)         the net change by previously authorized Change Order (note that this does not include changes authorized by Change Directive unless such changes were subsequently agreed to by the Design-Builder and recorded as a Change Order);

3)         the Subcontract Sum or Guaranteed Maximum Price prior to this Change Order;

4)         the amount of increase or decrease, if any, in the Subcontract Sum or Guaranteed Maximum Price; and

5)         the new Subcontract Sum or Guaranteed Maximum Price as adjusted by this Change Order.

Change in Subcontract Time. Insert in the blanks provided, and strike out the unused terms in parentheses:

1)         the amount (in days) of the increase or decrease, if any in the Subcontract Time; and

2)         the date of Substantial Completion, including any adjustment effected by this Change Order.

Executing the Document.

When the Design-Builder and Subcontractor have reached agreement on the change to be made in the Subcontract, including any adjustments in the Subcontract Sum or Guaranteed Maximum Price and Subcontract Time, AIA Document G741S should be executed in duplicate by the two parties, each retaining an original. It should also be noted that the Design-Builder, by executing AIA Document G741S, represents that any Project design changes implemented by this Change Order have been reviewed and approved in writing by the Architect or other licensed design professionals of record for the Project.

Notes.

Modifications. Particularly with respect to professional or contractor licensing laws, building codes, taxes, monetary and interest charges, arbitration, indemnification, format and font size, AIA Contract Documents may require modification to comply with state or local laws. Users are encouraged to consult an attorney before completing or modifying a document.

Reproductions. This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce this document. For more information, see the document footer and the AIA Contract Documents® Terms of Service.

Was this article helpful?
0 out of 0 found this helpful

Articles in this section

See more
For document related questions:
For technical support:
Our helpline hours:
8:30am - 6:00pm EST Monday to Friday